Home / Products / 16-Outlet C13 C19 Switched Rack PDU, TCP/IP, 1.5U Vertical
16-Outlet C13 C19 Switched Rack PDU, TCP/IP, 1.5U Vertical
Switched PDU

16-Outlet C13 C19 Switched Rack PDU, TCP/IP, 1.5U Vertical

Quick Answer16-Outlet C13 C19 Switched Rack PDU, TCP/IP, 1.5U Vertical — an IDCPDU Switched PDU for remotely managed racks.
  1. Per-outlet remote switching — A hung node or miner is power-cycled from the control room in seconds — no trip to the rack, and nothing else on the strip goes dark.
  2. Power read where it is consumed — Current, voltage, power and energy at the strip, shown on the local display and readable remotely — you spot a rack running out of headroom before the breaker trips.
  3. 0U vertical — no rack units consumed — The strip hangs on the rear post, so every U stays available for servers.
  4. ⁦110–250⁩ V wide input — One build covers 120 V and 230 V sites and rides out a brownout instead of dropping the load.
  5. C13 and C19 side by side — Servers, switches and storage hang off one strip — no second PDU just because the C19 count did not match the drawing.
  6. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.
  7. Hard-wired terminal block — There is no inlet plug to work loose or heat up — the feed lands on terminals sized for the strip's full current.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • Sixteen-outlet switched strip with per-outlet remote control
  • Twelve C13 and four C19 outlets on two separately breakered groups
  • LCD metering with SNMP, Modbus TCP and web access
  • Each group carries six C13 and two C19 outlets behind its own 1-pole hydraulic-magnetic breaker, so a hung server can be isolated and power-cycled from the browser without dropping the rest of the rack. Per-outlet relays allow sequential start with a 1 to 250 second interval between outlets, which keeps inrush from tripping the upstream breaker when a full rack comes back after a maintenance window. Current, voltage, power and energy are shown on the LCD and published over SNMP v1/v2/v3 or Modbus TCP.

Frequently Asked Questions

What does a switched PDU do that a metered PDU cannot?

A metered strip only reports current and power. This one also has a relay at every outlet, so the NOC can switch a single socket on or off remotely — the usual way to power-cycle a frozen server without sending an engineer to site.

Can I reboot one server without dropping the other fifteen?

Yes. Outlets are switched individually, so only the selected socket loses power. The other outlets keep running and stay on the same metering record.

Why two breakers instead of one main breaker?

The strip is built as two groups of eight outlets. Two 1-pole 32 A hydraulic-magnetic breakers give each group its own branch protection, so a fault in one group does not take the whole rack down and the remaining group still has a live feed.

How does sequential power-on protect the rack?

Inrush from fifteen or sixteen switch-mode supplies at once can trip the upstream breaker. The start interval is adjustable from 1 to 250 seconds, so outlets come up one after another instead of as a single surge.

Which protocols can our monitoring system use?

SNMP v1, v2 and v3, Modbus TCP, Modbus RTU over RS485, plus HTTP/HTTPS and SSH. It also accepts up to three slave strips on one master, so four strips appear as one device in the NMS.

Can the outlet mix and the input connection be changed?

Yes. Outlet count, C13 and C19 ratio, cord length and plug type are all built to drawing. We issue drawings within 30 minutes of your requirement and a quotation within one hour.

Related Products

← Back to Products