Home / Products / 16-Outlet C19 Switched Rack PDU, 2U Horizontal, 63 A
16-Outlet C19 Switched Rack PDU, 2U Horizontal, 63 A
Switched PDU

16-Outlet C19 Switched Rack PDU, 2U Horizontal, 63 A

Quick Answer16-Outlet C19 Switched Rack PDU, 2U Horizontal, 63 A — an IDCPDU Switched PDU for remotely managed racks.
  1. Per-outlet remote switching — A hung node or miner is power-cycled from the control room in seconds — no trip to the rack, and nothing else on the strip goes dark.
  2. Power read where it is consumed — Current, voltage, power and energy at the strip, shown on the local display and readable remotely — you spot a rack running out of headroom before the breaker trips.
  3. ⁦110–250⁩ V wide input — One build covers 120 V and 230 V sites and rides out a brownout instead of dropping the load.
  4. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.
  5. Hard-wired terminal block — There is no inlet plug to work loose or heat up — the feed lands on terminals sized for the strip's full current.
  6. Runs below zero — Tested from sub-zero ambient upward, so cold shelters and unheated halls are inside the envelope, not outside it.
  7. Built to drawing, not to a catalogue — Outlet mix, cable length and plug are set per order — sample-grade customisation without a tooling charge.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • Sixteen C19 outlets on a single 63 A feed, in a 2U box
  • Per-outlet switching and metering for sixteen C20-corded loads
  • Top or bottom cable entry, left or right power routing
  • Sixteen C19 outlets in one 2U chassis replace two vertical strips when a rack holds a dense block of blade chassis, storage shelves or network cores — every one of them arrives with a C20 cord, so C13 positions would sit unused. Each outlet switches and meters separately, letting you stage power-up of sixteen devices after a room-wide outage. The 63 A inlet takes a hard-wired five-wire feed from the panel, and the front LCD shows current, voltage, power and energy without opening the door.

Frequently Asked Questions

Why would I choose a 2U horizontal strip instead of a vertical one?

Because of the cable bend radius. Sixteen C19 cords leaving one face of a 2U box run straight back over a 100 mm deep tray, while the same sixteen cords on a vertical strip have to turn 90 degrees at the rail. In a 1000 mm deep rack the horizontal build also leaves both rear corners free for fibre.

All sixteen outlets are C19 — is that not too much for one 63 A feed?

No. Each C19 outlet is rated 16 A, but the strip as a whole is limited by the 63 A main breaker, so the practical load is 63 A total. The C19 pattern is about cord compatibility with blade and storage gear, not about drawing 16 A per outlet.

How is the strip mounted when both rear rails are already full?

The 465 mm body fixes to the 19-inch rails with four M6 screws and takes 2U of front space. Cable entry is available on either side, so the input feed can come from the same side as the busway or floor box.

Can outlets be grouped so one command stops a whole enclosure?

Yes. Outlet groups can be defined in the web interface, and one group command switches them together. Groups are also used for shared current thresholds, which is convenient when several outlets feed one blade enclosure.

What happens to outlet states after a power failure?

The last state is stored, so outlets return to their previous on or off condition when power comes back. With sequential start enabled they then come up in the configured order rather than all at once.

What is the lead time for a different outlet count?

Outlet count, C13 and C19 ratio, cord length and plug type are built to drawing. Drawings are issued within 30 minutes of your specification and the quotation follows within one hour.

Related Products