Tel: +86-574-63783045 · ricky@idcpdu.com
| Rack standard | 19-inch EIA-310 |
| Installation | Horizontal (2U) |
| Height | 2U body section (88 mm) |
| Mounting length | 465 mm |
| Outlet configuration | 16× IEC C19 |
| Outlet rating | C19: 16 A |
| Input connection | Hard-wired terminal block, 5-wire |
| Input voltage | 110–250 V AC, 50/60 Hz |
| Max input current | 63 A |
| Rated power | Up to 15 kW at 250 V |
| Phase | Single-phase |
| Main breaker | 1-pole hydraulic-magnetic breaker, 63 A |
| Surge protection | None |
| Metering | LCD, current / voltage / power / energy |
| Monitoring interface | TCP/IP, SNMP v1/v2/v3, Modbus TCP, RS485 |
| Outlet switching | Per-outlet remote on/off and metering |
| Cable entry | Left or right side |
| Housing | Cold-rolled steel, black powder coat |
| Operating temperature | -10–45 °C |
| Relative humidity | 0–90% RH, non-condensing |
| Included accessories | M6×16 screws, user manual |
| Certification | CE / EMC / RoHS; built under ISO 9001 |
| Customisation | Outlet count, cord length and plug type to drawing |
| Lead time | 7–15 working days after drawing approval |
Datasheet, manual and drawings for this product (PDF).
Our engineers reply within 24 hours on business days.
Tel: +86-574-63783045
Email: ricky@idcpdu.com
Tell us your requirements — our sales team will get back to you with a quotation.
Because of the cable bend radius. Sixteen C19 cords leaving one face of a 2U box run straight back over a 100 mm deep tray, while the same sixteen cords on a vertical strip have to turn 90 degrees at the rail. In a 1000 mm deep rack the horizontal build also leaves both rear corners free for fibre.
No. Each C19 outlet is rated 16 A, but the strip as a whole is limited by the 63 A main breaker, so the practical load is 63 A total. The C19 pattern is about cord compatibility with blade and storage gear, not about drawing 16 A per outlet.
The 465 mm body fixes to the 19-inch rails with four M6 screws and takes 2U of front space. Cable entry is available on either side, so the input feed can come from the same side as the busway or floor box.
Yes. Outlet groups can be defined in the web interface, and one group command switches them together. Groups are also used for shared current thresholds, which is convenient when several outlets feed one blade enclosure.
The last state is stored, so outlets return to their previous on or off condition when power comes back. With sequential start enabled they then come up in the configured order rather than all at once.
Outlet count, C13 and C19 ratio, cord length and plug type are built to drawing. Drawings are issued within 30 minutes of your specification and the quotation follows within one hour.