Home / Products / 18-Outlet IEC C19 Three-Phase Vertical Rack PDU, 380 V 63 A, Hydraulic Breaker, 0U
18-Outlet IEC C19 Three-Phase Vertical Rack PDU, 380 V 63 A, Hydraulic Breaker, 0U
Basic PDU

18-Outlet IEC C19 Three-Phase Vertical Rack PDU, 380 V 63 A, Hydraulic Breaker, 0U

Quick Answer18-Outlet IEC C19 Three-Phase Vertical Rack PDU, 380 V 63 A, Hydraulic Breaker, 0U — an IDCPDU Basic PDU for data-centre and equipment-room racks.
  1. 0U vertical — no rack units consumed — The strip hangs on the rear post, so every U stays available for servers.
  2. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.
  3. Passive build, nothing to fail — No metering board and no switching relay inside — for a basic strip that means fewer parts that can take a rack down.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • 18× IEC C19 outlets, three-phase 380 V input
  • 63 A per phase feed, 16 A per C19 outlet
  • Hydraulic breaker, 0U vertical body
  • All-C19 layouts suit blade chassis, storage shelves and GPU nodes that ship with C20 inlets; three-phase input balances the load across L1, L2 and L3 instead of loading one 230 V circuit.
  • The 1358 mm body mounts on the rear rail and the breaker isolates all three phases in one action — useful when a technician has to work on a fully loaded rack.
  • Used in HPC and GPU clusters, storage arrays and enterprise racks fed from a ⁦380–400⁩ V three-phase UPS.
  • Phase allocation across outlet groups is set to drawing: layout within 30 minutes, quotation within 1 hour.

Frequently Asked Questions

Is the input 380 V line-to-line?

Yes, 380 V between phases with ⁦220–250⁩ V phase to neutral, which is the common European and Asian three-phase supply.

How is load balanced across phases?

Outlets are grouped in three sets wired to L1, L2 and L3. Tell us the intended appliance layout and we allocate outlets to keep phases within 10% of each other.

Can C19 outlets feed C13 devices?

Only with a C20-to-C13 jumper cord. C19 outlets are for appliances with C20 inlets, typically blade chassis and storage.

Do I need a three-phase breaker upstream?

Yes, the built-in 3-pole breaker is the local isolator; upstream protection at the panel or UPS remains mandatory.

Is this suitable for GPU servers?

Yes — GPU nodes usually ship with C20 inlets and draw ⁦3–5⁩ kW each, which is why an all-C19 layout is used.

What is the lead time for 20 units?

Drawing within 30 minutes, quotation within 1 hour, production ⁦10–20⁩ working days for 20 units.

Related Products

← Back to Products