Tel: +86-574-63783045 · ricky@idcpdu.com
| Rack standard | 19-inch EIA-310 |
| Installation | Vertical (0U) |
| Mounting length | 1358 mm |
| Body dimensions (W×H) | 60 × 85 mm |
| Outlet configuration | 18× South African Type M |
| Outlet rating | 15 A per outlet |
| Max input current | 63 A |
| Input voltage | 250 V AC, 50/60 Hz |
| Phase | Single-phase |
| Input connection | OT terminal junction box |
| Main breaker | Hydraulic magnetic breaker |
| Surge protection | 1-lamp SPD |
| Housing | Cold-rolled steel, black powder coat |
| Operating temperature | 10–45 °C |
| Relative humidity | 0–90% RH, non-condensing |
| Included accessories | M6×16 screws, user manual |
| Certification | CE / EMC; built under ISO 9001 |
Datasheet, manual and drawings for this product (PDF).
Our engineers reply within 24 hours on business days.
Tel: +86-574-63783045
Email: ricky@idcpdu.com
Tell us your requirements — our sales team will get back to you with a quotation.
The trip curve of a hydraulic magnetic breaker is set by a hydraulic delay and a magnetic coil, so it holds its threshold from 10 °C to 45 °C. A thermal MCB drifts as the rear aisle warms up and can nuisance-trip on a hot afternoon.
The SPD is a plug-in module with a status lamp. When the lamp goes out the cartridge is spent and is swapped in the field without removing the strip.
Yes. At 60 mm wide each, a pair takes 120 mm of the rear channel and still leaves room for a vertical cable manager between them.
South African 15 A three-pin plugs (large and small Type M), which covers servers delivered with ZA cords, switches and PDUs feeding downstream racks.
This version is single-phase, 250 V. A three-phase version with the same 18 outlets is available to drawing if the rack is fed from a 400 V supply.
Drawing within 30 minutes and quotation within 1 hour; production 7–15 working days, with air freight to Johannesburg typically 5–7 days after dispatch.