Home / Products / 19-Outlet IEC C13/C19 Vertical Rack PDU, 110–250 V 63 A, Hydraulic Breaker and 3-Lamp SPD, 0U
19-Outlet IEC C13/C19 Vertical Rack PDU, 110–250 V 63 A, Hydraulic Breaker and 3-Lamp SPD, 0U
Basic PDU

19-Outlet IEC C13/C19 Vertical Rack PDU, 110–250 V 63 A, Hydraulic Breaker and 3-Lamp SPD, 0U

Quick Answer19-Outlet IEC C13/C19 Vertical Rack PDU, ⁦110–250⁩ V 63 A, Hydraulic Breaker and 3-Lamp SPD, 0U — an IDCPDU Basic PDU for data-centre and equipment-room racks.
  1. Surge clamped before the power supplies — Lightning and switching surges are discharged at the strip; the status lamp shows when the cartridge is spent instead of failing silently.
  2. 0U vertical — no rack units consumed — The strip hangs on the rear post, so every U stays available for servers.
  3. ⁦110–250⁩ V wide input — One build covers 120 V and 230 V sites and rides out a brownout instead of dropping the load.
  4. C13 and C19 side by side — Servers, switches and storage hang off one strip — no second PDU just because the C19 count did not match the drawing.
  5. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • 19 mixed IEC C13 and C19 outlets, 0U vertical
  • ⁦110–250⁩ V wide input, 63 A, C13 at 10 A, C19 at 16 A
  • Hydraulic breaker with three-lamp surge status
  • Servers on C13 and switches or blade chassis on C19 share one strip, so a rack no longer needs two separate PDUs per side. The 1358 mm body fits 42U rails on 60 × 85 mm section.
  • The three-lamp SPD shows L-N, L-E and N-E status separately, which tells an electrician whether the strip is seeing a phase fault or a neutral fault before anything is unplugged.
  • Chosen for mixed-load racks in enterprise data centres, edge sites and broadcast rooms where both C13 and C19 appliances sit in the same cabinet.
  • Outlet mix, cable length and plug type are built to drawing: layout within 30 minutes, quotation within 1 hour.

Frequently Asked Questions

How many C13 and C19 outlets are there in total?

19 outlets in total, split between C13 and C19 to the mix you specify. Tell us the ratio at order — 15 C13 plus 4 C19 is the most common for a mixed server and switch rack.

Does the three-lamp SPD replace a surge arrester upstream?

No. It protects equipment downstream of the strip; the building or UPS-level arrester still handles large incoming surges.

Can C13 and C19 outlets be on separate breakers?

Yes. We build two-pole arrangements so the C19 group sits on its own breaker, which is useful when blade chassis draw most of the load.

What does ⁦110–250⁩ V wide input mean in practice?

The same strip works on 120 V North American and 230 V European supplies, so one SKU can cover both builds without a voltage-specific variant.

Is the strip suitable for 42U racks only?

1358 mm matches 42U rails; for 47U, 27U or wall boxes we cut the body and busbar to the rail distance you give us.

What is the lead time for a custom C13/C19 ratio?

Layout drawing within 30 minutes, quotation within 1 hour, and ⁦7–15⁩ working days for production after drawing approval.

Related Products

← Back to Products