Home / Products / 22-Outlet C13/C19 Metered Rack PDU, 1.5U Vertical, Hot-Swap Meter, RS485, SPD
22-Outlet C13/C19 Metered Rack PDU, 1.5U Vertical, Hot-Swap Meter, RS485, SPD
Metered PDU

22-Outlet C13/C19 Metered Rack PDU, 1.5U Vertical, Hot-Swap Meter, RS485, SPD

Quick Answer22-Outlet C13/C19 Metered Rack PDU, 1.5U Vertical, Hot-Swap Meter, RS485, SPD — an IDCPDU Metered PDU for metered racks in data centres.
  1. Power read where it is consumed — Current, voltage, power and energy at the strip, shown on the local display and readable remotely — you spot a rack running out of headroom before the breaker trips.
  2. Surge clamped before the power supplies — Lightning and switching surges are discharged at the strip; the status lamp shows when the cartridge is spent instead of failing silently.
  3. 22 outlets on one strip — A single strip feeds a whole rack, so adding a node no longer means a second PDU and a second feed cable.
  4. 0U vertical — no rack units consumed — The strip hangs on the rear post, so every U stays available for servers.
  5. C13 and C19 side by side — Servers, switches and storage hang off one strip — no second PDU just because the C19 count did not match the drawing.
  6. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.
  7. Hard-wired terminal block — There is no inlet plug to work loose or heat up — the feed lands on terminals sized for the strip's full current.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • 22-outlet metered strip for taller cabinets in a 19-inch rack
  • Two extra outlets over the 20-way model cover switch and storage pairs
  • Hot-swap meter, RS485 Modbus-RTU and 3-lamp surge protection
  • Twenty-two outlets suit a 47U cabinet where each 1U server pair needs its own outlet and the two spare positions go to top-of-rack switches. Surge protection is three-lamp, so phase, neutral and earth status are visible individually. The meter bay swaps without shutdown and reports total current, voltage, power and energy over RS485.

Frequently Asked Questions

Is 22 outlets worth it over 20?

It is when the cabinet has a switch pair plus a storage pair, or when every two 1U servers must sit on adjacent outlets. The two extra positions avoid a second strip for four devices — the difference between one feed and two in a 47U cabinet.

What do the three surge lamps indicate?

Phase, neutral and earth. A lamp out means that path has lost its protective element or the wiring is wrong, which is common on older cabinets where the earth bar is shared with other equipment.

Can the strip meter per outlet as well as per branch?

No. This model meters at the inlet and reports the total for the strip. If you need per-outlet current to bill tenants or find a single runaway server, specify the metered-outlet version instead.

How does the RS485 chain behave if one strip loses power?

The bus keeps working for the other strips; only the address of the failed unit drops out. Use a gateway that polls by address and reports missing nodes, rather than one that stops at the first timeout.

Can the strip be fitted in a 42U cabinet?

Yes, but the 22 outlets may be more than the cabinet needs; the mounting length is what matters, not the outlet count. Confirm rail centres before ordering so the strip bolts at both ends.

What is the lead time for a 32 A build with a different outlet split?

Seven to fifteen working days from drawing approval. Send the split and the plug type, and we return a drawing within 30 minutes and a price within the hour.

Related Products

← Back to Products