Home / Products / 24-Outlet C13/C19 Metered Rack PDU, 380–415 V, 32 A Industrial Plug, 0U
24-Outlet C13/C19 Metered Rack PDU, 380–415 V, 32 A Industrial Plug, 0U
Metered PDU

24-Outlet C13/C19 Metered Rack PDU, 380–415 V, 32 A Industrial Plug, 0U

Quick Answer24-Outlet C13/C19 Metered Rack PDU, ⁦380–415⁩ V, 32 A Industrial Plug, 0U — an IDCPDU Metered PDU for metered racks in data centres.
  1. Power read where it is consumed — Current, voltage, power and energy at the strip, shown on the local display and readable remotely — you spot a rack running out of headroom before the breaker trips.
  2. Three-phase feed, load spread over L1/L2/L3 — The rack is not hung on one leg, and the 23 kW envelope matches GPU, blade and miner density.
  3. 24 outlets on one strip — A single strip feeds a whole rack, so adding a node no longer means a second PDU and a second feed cable.
  4. 0U vertical — no rack units consumed — The strip hangs on the rear post, so every U stays available for servers.
  5. C13 and C19 side by side — Servers, switches and storage hang off one strip — no second PDU just because the C19 count did not match the drawing.
  6. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.
  7. Field-standard input plug — Terminated with the connector electricians on site already stock, so commissioning does not wait for an adapter.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • Vertical 24-outlet metered strip with a 32 A five-pin industrial plug
  • ⁦380–415⁩ V three-phase input, no hard wiring required on site
  • Per-group thresholds with local overload protection
  • The five-pin IEC 60309 plug lets the strip be connected and disconnected at the rack, which suits rented space, temporary builds and containers where hard wiring needs an electrician. Twenty-four C13/C19 outlets share the three phases, and current, voltage, power and energy are reported on the panel. Overload protection trips the strip before the upstream breaker takes the whole row down.

Frequently Asked Questions

Which plug does the strip use and why does it matter?

A five-pin IEC 60309 plug rated 32 A, colour-coded red for ⁦380–415⁩ V. It can be unplugged at the rack, so a build or a move does not need an electrician to disconnect a hard-wired feed.

Can it be plugged into a standard socket?

No. A 32 A five-pin industrial socket is a different interface from a 16 A CEE or a domestic outlet. Confirm the socket type at the rack before ordering, or ask for a different plug.

Does overload protection replace the upstream breaker?

No, it is additional. The strip trips on its own overload so a fault inside the cabinet does not take down the branch feeding other cabinets, but the upstream circuit still needs its own protection.

Is the cord length fixed?

The standard build is 2 m. Length and plug type are built to drawing, so a rack with a distant socket can be specified with a longer cord.

How are the 24 outlets spread over three phases?

In groups, so each phase carries about a third of the outlets. Check per-phase current at commissioning; a strip loaded on one phase only will trip its breaker long before 23 kW is reached.

What is the delivery time for a 16 A plug version?

Seven to fifteen working days after drawing approval. Send the plug type, cord length and outlet split, and we return a drawing within 30 minutes and a quotation within the hour.

Related Products