Home / Products / 24-Outlet 16×C13 + 8×C19 Vertical Rack PDU, Digital Meter and SPD, 110–250 V 63 A, 0U
24-Outlet 16×C13 + 8×C19 Vertical Rack PDU, Digital Meter and SPD, 110–250 V 63 A, 0U
Basic PDU

24-Outlet 16×C13 + 8×C19 Vertical Rack PDU, Digital Meter and SPD, 110–250 V 63 A, 0U

Quick Answer24-Outlet 16×C13 + 8×C19 Vertical Rack PDU, Digital Meter and SPD, ⁦110–250⁩ V 63 A, 0U — an IDCPDU Basic PDU for data-centre and equipment-room racks.
  1. Power read where it is consumed — Current, voltage, power and energy at the strip, shown on the local display and readable remotely — you spot a rack running out of headroom before the breaker trips.
  2. Surge clamped before the power supplies — Lightning and switching surges are discharged at the strip; the status lamp shows when the cartridge is spent instead of failing silently.
  3. 0U vertical — no rack units consumed — The strip hangs on the rear post, so every U stays available for servers.
  4. ⁦110–250⁩ V wide input — One build covers 120 V and 230 V sites and rides out a brownout instead of dropping the load.
  5. C13 and C19 side by side — Servers, switches and storage hang off one strip — no second PDU just because the C19 count did not match the drawing.
  6. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • 16× IEC C13 plus 8× IEC C19 outlets, 0U
  • Digital ammeter and voltmeter on the front face
  • Breaker plus surge protection in one strip
  • The split of 16 C13 and 8 C19 matches a rack of 1U servers with two blade chassis or storage shelves; the 1358 mm body mounts on 42U rails at 60 × 85 mm section.
  • The meter reads true RMS current and voltage, so a technician can confirm loading before adding a server instead of estimating from nameplate figures.
  • Used in enterprise racks, HPC clusters and colocation cages where per-strip current visibility is required but full network metering is not.
  • Metering resolution, outlet mix and cable length are built to drawing: layout within 30 minutes, quotation within 1 hour.

Frequently Asked Questions

Is the meter per outlet or for the whole strip?

It shows total strip current and voltage. Per-outlet metering requires the switched metered version with a network module.

Why 16 C13 and 8 C19 instead of an even split?

That ratio follows real rack loading: many 1U servers on C13 cords and a few high-draw chassis on C19.

Can the meter be read remotely?

Not on this version — it is a local display. For SNMP or Modbus data choose the metered PDU with RS485 or TCP/IP.

Does the SPD module need maintenance?

Only replacement when the indicator shows it is spent; there is no routine maintenance.

Is the 63 A input protected by the built-in breaker?

Yes, the main breaker protects the whole strip and doubles as a local isolator for service.

What is the lead time for a 15/9 split instead of 16/8?

Layout within 30 minutes, quotation within 1 hour, production ⁦7–15⁩ working days after drawing approval.

Related Products

← Back to Products