
Tel: +86-574-63783045 · ricky@idcpdu.com
| Rack standard | 19-inch EIA-310 |
| Installation | Vertical (0U) |
| Height | 2U body section (88 mm) |
| Outlet configuration | 24× IEC C19 |
| Outlet rating | C19: 16 A |
| Input connection | Hard-wired terminal block, 5-wire |
| Input voltage | 380–415 V AC three-phase, 50/60 Hz |
| Max input current | 125 A per phase |
| Rated power | 70 kW |
| Phase | Three-phase |
| Main breaker | 3-pole breaker |
| Surge protection | None |
| Metering | LCD, current / voltage / power / energy per phase |
| Monitoring interface | RS485 Modbus-RTU |
| Outlet switching | None |
| Housing | Cold-rolled steel, black powder coat |
| Operating temperature | -10–45 °C |
| Relative humidity | 0–90% RH, non-condensing |
| Included accessories | M6×16 screws, user manual |
| Certification | CE / EMC / RoHS; built under ISO 9001 |
| Customisation | Outlet count, cord length and plug type to drawing |
| Lead time | 7–15 working days after drawing approval |
Datasheet, manual and drawings for this product (PDF).
Our engineers reply within 24 hours on business days.
Tel: +86-574-63783045
Email: ricky@idcpdu.com
Tell us your requirements — our sales team will get back to you with a quotation.
Because the loads are GPU nodes, blade chassis and storage shelves, which ship with C20 inlets. A C19 outlet delivers 16 A, so 24 of them cover 70 kW of three-phase capacity without adapters that would otherwise be needed on every cord.
Three phases at 380–415 V and 125 A each give roughly 82 kVA; the 70 kW rating leaves margin for power factor below unity. Treat 70 kW as the working limit and check per-phase current on the LCD rather than assuming a balanced cabinet.
A three-pole main breaker on the inlet and group thresholds monitored per phase. There is no per-outlet breaker: the downstream equipment is expected to have its own protection, as blade chassis and GPU shelves normally do.
Yes. It was drawn for high-density compute, including hash containers where ambient runs hot. Keep the inlet below 125 A per phase and confirm the container has its own upstream protection and earthing.
Over RS485 Modbus-RTU. Point the collector at the strip address, and per-phase current, voltage, power and energy are read as standard registers. A gateway is needed if your DCIM only speaks IP.
Seven to fifteen working days after drawing approval. Send the outlet split and the inlet type, and we return a drawing within 30 minutes and a quotation within the hour.



