Home / Products / 27-Outlet 12×C13 + 15×Schuko Vertical Rack PDU, Hot-Swap Meter, 63 A, 0U
27-Outlet 12×C13 + 15×Schuko Vertical Rack PDU, Hot-Swap Meter, 63 A, 0U
Basic PDU

27-Outlet 12×C13 + 15×Schuko Vertical Rack PDU, Hot-Swap Meter, 63 A, 0U

Quick Answer27-Outlet 12×C13 + 15×Schuko Vertical Rack PDU, Hot-Swap Meter, 63 A, 0U — an IDCPDU Basic PDU for data-centre and equipment-room racks.
  1. Power read where it is consumed — Current, voltage, power and energy at the strip, shown on the local display and readable remotely — you spot a rack running out of headroom before the breaker trips.
  2. Local socket pattern, not an adapter job — Outlets are the pattern already installed in the building, so equipment cords go straight in — one joint less to loosen inside a live rack.
  3. 0U vertical — no rack units consumed — The strip hangs on the rear post, so every U stays available for servers.
  4. ⁦110–250⁩ V wide input — One build covers 120 V and 230 V sites and rides out a brownout instead of dropping the load.
  5. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • 12× IEC C13 plus 15× German Schuko outlets
  • Schuko group at ⁦220–250⁩ V, C13 group at ⁦110–250⁩ V
  • Hot-swap current and voltage meter, hydraulic breaker
  • German and Central European racks often mix IEC servers with Schuko-fed network gear and lab equipment; this strip serves both from one 63 A feed on a 1358 mm body.
  • The meter sits in a hot-swap module: it can be replaced without dropping the load, which avoids a rack shutdown if the display fails.
  • Used in German, Austrian, Swiss and Polish IT rooms, university labs and industrial control cabinets.
  • Outlet ratio and cable length are built to drawing: layout within 30 minutes, quotation within 1 hour.

Frequently Asked Questions

Is the C13 group 110 V or 230 V?

The C13 group accepts ⁦110–250⁩ V, while Schuko outlets are for ⁦220–250⁩ V. Both groups are fed from the same 63 A input.

Can the meter really be swapped live?

Yes. The module plugs into a socket on the strip and is replaced without interrupting the outlets, so the rack keeps running.

Do Schuko outlets accept both flat and round pins?

They accept standard European Type F plugs with round pins and side earth clips; flat-pin plugs need an adapter.

Is this suitable for a lab with mixed instrumentation?

Yes — the 15 Schuko outlets cover instruments and test gear while the 12 C13 outlets serve servers and switches.

Can the outlet ratio be changed?

Yes, any ratio of C13 to Schuko can be built on the same body; the busbar and breaker stay the same.

What is the delivery time to Germany?

Drawing within 30 minutes and quotation within 1 hour; production ⁦7–15⁩ working days, sea freight to Hamburg about 30 days.

Related Products

← Back to Products