Home / Products / 28-Outlet IEC C13/C19 Vertical Rack PDU, 110–250 V 63 A, Hydraulic Breaker and SPD, 0U
28-Outlet IEC C13/C19 Vertical Rack PDU, 110–250 V 63 A, Hydraulic Breaker and SPD, 0U
Basic PDU

28-Outlet IEC C13/C19 Vertical Rack PDU, 110–250 V 63 A, Hydraulic Breaker and SPD, 0U

Quick Answer28-Outlet IEC C13/C19 Vertical Rack PDU, ⁦110–250⁩ V 63 A, Hydraulic Breaker and SPD, 0U — an IDCPDU Basic PDU for data-centre and equipment-room racks.
  1. Surge clamped before the power supplies — Lightning and switching surges are discharged at the strip; the status lamp shows when the cartridge is spent instead of failing silently.
  2. 28 outlets on one strip — A single strip feeds a whole rack, so adding a node no longer means a second PDU and a second feed cable.
  3. 0U vertical — no rack units consumed — The strip hangs on the rear post, so every U stays available for servers.
  4. ⁦110–250⁩ V wide input — One build covers 120 V and 230 V sites and rides out a brownout instead of dropping the load.
  5. C13 and C19 side by side — Servers, switches and storage hang off one strip — no second PDU just because the C19 count did not match the drawing.
  6. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • 28 IEC C13/C19 outlets on a 0U strip
  • One PDU serves a fully populated 42U rack
  • Hydraulic breaker plus 1-lamp surge protection
  • Twenty-eight outlets let a single strip feed both sides of a dense rack through C13 cords with C19 for the heavier appliances, so the second PDU can be reserved as an A/B feed.
  • The 1358 mm body is 60 × 85 mm and mounts on the rear rail without blocking the door or the vertical cable manager; the breaker doubles as a local isolator.
  • Used in dense compute racks, virtualisation clusters and storage arrays where outlet count, not switching, is the constraint.
  • Outlet mix and cable length are built to drawing: layout within 30 minutes, quotation within 1 hour.

Frequently Asked Questions

Can 28 outlets run on one 63 A feed?

Yes, if total load stays under 63 A. With ⁦1–2⁩ A servers, 28 outlets typically draw ⁦30–45⁩ A, leaving margin for peak draw.

Should I still install a second PDU for redundancy?

For A/B power you need two feeds and two strips; this PDU covers one feed, so a second unit on the other feed gives full redundancy.

What is the C13 to C19 split?

It is set at order; a typical dense rack uses 22 C13 and 6 C19. Any ratio can be built on the same body.

Is the SPD monitored remotely?

No — it has a local indicator lamp. Remote alarm requires the metered network version.

Does the strip fit a 47U rack?

The standard body is 1358 mm for 42U; a longer body is cut for 47U on request.

What is the production time?

Drawing within 30 minutes, quotation within 1 hour, production ⁦7–15⁩ working days after approval.

Related Products

← Back to Products